John Deer – Augusta
- Date: SEPTEMBER 2020
- Project Type: Flat Sawing, Core Drilling, DXR Robotic Demolition, Wall Sawing, Chain Sawing
About this Project
ACCC was contracted to flat saw and remove more than 30,000 linear feet of 8-inch-thick concrete slab on grade. Multiple crews assisted with cutting and removal to complete job in a timely manner. Our DXR
robotic demolition machine was also used to break footers out.
Other Projects
DXR Pool
At this residential site, ACCC was contracted to demo a pool. An elevated pool foundation and a small work space was a challenge, but with the robotic DXR, we were able to crawl inside the pool and work inside out.
Niagra Water Bottling – Florence, SC
ACCC was contracted to flat saw and remove more than 30,000 linear feet of 8-inch-thick concrete slab on grade. Multiple crews assisted with cutting and removal to complete job in a timely manner. Our DXR robotic demolition machine was also used to break footers out.
Riverfront Park - Charleston
ACCC was contracted to perform the cutting and removal services for the renovations to the Riverfront Park on the old Navy base. The work included wall sawing, core drilling, and the use of our roll-off dumpster service to haul away over 550,000 lbs of concrete.