(843) 832-1881 [email protected]

John Deer – Augusta

  • Date: 12 April 2018
  • Project Type: Building Renovation

About this Project

Lectus erat, consectetur eu sapien eget rhoncus consectetur sem. Proin cursus, dolor a mollis consectetur, risus dolor fermentum massa, a commodo elit dui sit amet risus.

More Projects

DXR Pool

At this residential site, ACCC was contracted to demo a pool. An elevated pool foundation and a small work space was a challenge, but with the robotic DXR, we were able to crawl inside the pool and work inside out.

Niagra Water Bottling – Florence, SC

ACCC was contracted to flat saw and remove more than 30,000 linear feet of 8-inch-thick concrete slab on grade. Multiple crews assisted with cutting and removal to complete job in a timely manner. Our DXR robotic demolition machine was also used to break footers out.

Riverfront Park - Charleston

ACCC was contracted to perform the cutting and removal services for the renovations to the Riverfront Park on the old Navy base. The work included wall sawing, core drilling, and the use of our roll-off dumpster service to haul away over 550,000 lbs of concrete.

Contact Us

9516 Hamburg Rd. Suite 101 Ladson, SC 29456

(843) 832-1881